Specialty trade contractors distinguish themselves by the level and quality of training they provide to their employees.

Superior Tile & Stone recently demonstrated its commitment to training by providing the newest members of its terrazzo team with a specifically designed training program tailored to the needs of an apprentice terrazzo mechanic.  Superior set up a full scale training facility in a portion of its 30,000 square foot fabrication and warehouse facility.  Superior’s master terrazzo mechanics, Steve Young and Michael Jackson, delivered the training and guidance to each member of the team.  Steve and Michael walked the men through the installation process from start to finish providing each with extensive hands-on training of every aspect of the installation process.  After 7 full working days, all six trainees are ready to apply their newly learned skills and knowledge.

The following images display the entire process:

1-Divder Strip Installation

The Terrazzo Mechanic laying out and installing the divider strips over a crack isolation membrane installed the previous day.

 

 

 

 

 

 

 

 

Here is the installation of epoxy terrazzo in progress.

Here is the installation of epoxy terrazzo in progress.

 

 

 

 

 

 

 

 

 

 

 

 

This photo shows the Terrazzo Mechanic grinding the edges (border) with a terrazzo base machine.

This photo shows the Terrazzo Mechanic grinding the edges (border) with a terrazzo base machine.

 

 

 

 

 

 

 

 

 

 

 

 

 

The Terrazzo Mechanic using a terrazzo floor grinding machine to grind the terrazzo floor.

The Terrazzo Mechanic using a terrazzo floor grinding machine to grind the terrazzo floor.

 

 

 

 

 

 

 

 

 

 

 

 

 

When the grinding is complete it produces small pin holes in the terrazzo which requires the Terrazzo Mechanic to fill the holes with epoxy.  This procedure is called “grouting.”

When the grinding is complete it produces small pin holes in the terrazzo which requires the Terrazzo Mechanic to fill the holes with epoxy. This procedure is called “grouting.”

 

 

 

 

 

 

 

 

 

 

 

 

 

 

After the grout has dried, the Terrazzo Mechanic uses a terrazzo floor grinder to polish the floor up to 120 grit.

After the grout has dried, the Terrazzo Mechanic uses a terrazzo floor grinder to polish the floor up to 120 grit.

 

 

 

 

 

 

 

 

The Terrazzo Mechanic will thoroughly clean the floor and apply a terrazzo sealer.  This completes the installation process.

The Terrazzo Mechanic will thoroughly clean the floor and apply a terrazzo sealer. This completes the installation process.

 

 

 

 

 

 

 

 

 

 

 

 

 

The beautiful, completed floor!

The beautiful, completed floor!

 

 

 

 

 

 

 

 

After a long week, the Terrazzo team is basking in their success!

After a long week, the Terrazzo team is basking in their success!