Transbay Tower Block 6 – Building C
I just wanted to take a moment to let you guys know that your work out here at Building C has been exemplary.  All the guys BB/CC Affordable team have nothing but the highest praise for what you are producing out here.  Tory gave you guys “two thumbs up”.  Everything from your attention to detail on the office side to your field install crews, everything out here has been excellent.  Thanks for making a difficult job a little easier for us.

Robert Saravia, Project Manager
BALFOUR BEATTY & CAHILL CONTRACTORS


425 Market Street Lobby Renovation
I wanted to share with you a great phone call I just received.  Nick Brereton (Brereton Architects) just phoned to tell me he thought the stone work was the finest he has seen and was just amazed at the quality of your work as well as all the finishes.  I think this is very high praise when an architect unrelated to the job takes the time to call and pass on his critique.

Trip Collaro, Vice President Construction
RICHLEN CONSTRUCTION


Smith Center for Performing Arts
Congratulations to Superior Tile & Stone for winning a prestigious MIA 2012 Pinnacle Award of Merit.  Superior Tile received this award for the Smith Center for Performing Arts project.  According the Garis Distelhorst, Executive Vice President of MIA, “Your winning entry reflects your company’s high standards and serve the entire industry by showcasing the superior quality and beauty of natural stone and the commitment to craftsmanship of MIA member firms.”

Chris Pattavina
TILE CONTRACTORS’ ASSOCIATION OF AMERICA (TCAA)

I was at the Smith Center a week before Christmas and it is absolutely stunning.  The stone work throughout the interior is truly spectacular.

Gregory M. Hoss, AIA
DAVID M. SCHWARZ ARCHITECTS


Alta Bates Hospital
First, I would like to thank all of you for stepping up and getting this entry area done for the project.  Specifically want to let you know that Tim Allen did an outstanding job working under extremely difficult conditions.  Working on Easter Sunday was huge and appreciated.  I know this was very painful to get through but I will say that the last impression stands and your group did an outstanding job on the project!  Thanks again and hope to work with you all on the next project!

David Guidry
DPR CONSTRUCTION

Working with Gerry & Tim at Alta Bates in Oakland has been great.  They are easy to work with and really know what they are doing.  I hope I get to work with them again.

Ted Link
DPR CONSTRUCTION


John Swett High School
I just wanted to let you know your crew did a great job here at John Swett High School.  They were professional, asked the right questions and ran a safe operation.  I was very impressed.  I hope to see Superior Tile & Stone on the next project.

Tony Bruno
C. OVERAA & CO.


555 California St. ADA Upgrades
I wanted to take a minute to let you know how happy I am with the performance of Superior Tile on this long and trying project. The quality of your work and the professionalism of your team is greatly appreciated and should be recognized. The cut-in of the granite ADA striping on the exterior stairs, the correction of the Sidley Austin lobby on the 20th floor and the leveling of the Cal St ADA entrance were all extremely precise and difficult projects that your team completed to near perfection. Your stonework is some of the best work I’ve seen in my 20yrs of contracting experience (including Chicago, NYC and SF). Special recognition should be given to the following members of your team: Gerry Martin – hands down, the best stone mason west of the Mississippi and the principal reason for the success of these projects. Thank you for your attention to design intent, quality of work and providing a finished product that exceeds expectations. Tim Walker – extremely accommodating and honest. Thank you for being a voice reason (when needed) and for following through on your commitments to manpower & scheduling. Tom Valles – from start to finish you have provided accurate and fair pricing, worked with us to vet out the most optimal solutions given our budget constraints and have shown extreme patience throughout the process. Thank you for your help and partnership in seeing this project through to completion. I greatly appreciate the efforts and patience of the entire Superior Tile & Stone team throughout this project.

Kevin P. O’Leary
BCCI CONSTRUCTION COMPANY


5440 Patrick Henry – Market Ready

I wanted to reach out to you and pass along our clients comments about the tile work at 5440 Patrick Henry.  The client was extremely impressed with the quality of work and attention to detail.  The job looks great!  The representative form D.E.S. Architecture said it was one of the best tile installs he had ever seen.  They are a pretty big architecture firm and I am sure he has seen a lot of tile installs so for him to say that means a lot.

Thank your crew and Danny Wilcox for us.  We are only as good as our subcontractors and when you do your job well it makes us look good.  Keep up the good work.

Ben Petty
MCLARNEY CONSTRUCTION


Whole Cakes Bakery

I just wanted to say what a great job your guys did on Whole Cakes.  Like normal your guys were fast, clean and professional.  Thanks again for another great job.  I will be sure to pass this along to the rest of the PM’s in the office.

Matt Brennan
R.N. FIELD CONSTRUCTION


Saint Ignatius College Preparatory

Just wanted to say thank your man Steve’s above and beyond effort on the terrazzo floor at Saint Ignatius College Preparatory School.  His professionalism really shows not only on the quality of his work but the way he stayed later to ensure that Plant would meet the schedule.  I look forward to working with you again.

Lloyd Berges
PLANT CONSTRUCTION


Pacific Union Club

Mr. Conner:
We have not met but my name is Mike Fraley and I manage the field operations for BCCI.  As you know, we are in the final stages of a very high profile and difficult project.  BCCI and Superior have just finished the most extensive remodeling project in 100 years at the Pacific Union Club.  As you might imagine, the logistics were very challenging as was the constantly changing scope of work and schedule.

I wanted to take a moment to thank your entire team on the level of professionalism and quality that your firm provided to our project.  I know there were extreme staffing challenges throughout the project.  Tim Walker and Fred Steed worked with us to provide the staff needed to complete this very important project.

Please accept BCCI’s sincere gratitude on a job well done.

Michael Fraley
BCCI CONSTRUCTION COMPANY